Requirements
- Implement a class or service with two core operations:
AddTask(tasks): add one or more tasks to the processor.ConsumeTask(): return and consume the eligible task with the smallest deadline.
- Part 1 input is a list of tasks with task id and deadline. Recent examples use string ids and integer deadlines, roughly:
[{"id": "1", "deadline": 2}]- Part 1 behavior:
- No dependencies exist.
ConsumeTask()pops the task with the smallest deadline.- If no task is available, return the designated empty-task value; one version describes this as a "no task" return.
- Part 2 adds
subtasks/ prerequisite ids:
[{"id": "1", "deadline": 2, "subtasks": ["2", "3"]}]- A task can be consumed only after all of its subtasks have already been consumed.
- Among all currently eligible tasks, still choose the smallest deadline.
- Maintain parent and child dependency state so a newly eligible parent enters the ready set only after the last outstanding subtask is consumed.
- Part 3 variants:
updateDeadline(task_id, new_deadline)updates a task that has not yet been consumed.- If the task has already been consumed, return
Noneor otherwise reject the update. - When using a heap, handle stale heap entries by checking whether the
(deadline, task_id)pair still matches the current task state when popped.
- Additional follow-ups:
- Time complexity for each operation.
- Task validation, DAG verification, and cycle handling.
- Concurrency if multiple consumers operate at the same time.
- Streaming arrival of tasks rather than one fixed batch.
- Production unit-test design.
Examples
Dependency order example from the prompt family:
[
{"id": "1", "deadline": 2, "subtasks": ["2"]},
{"id": "2", "deadline": 4, "subtasks": []}
]Task 1 has the earlier deadline, but task 2 must be consumed first because 1 depends on it. The consume order is therefore 2, then 1.
Notes
- The ready queue is naturally a min-heap keyed by deadline. The non-ready tasks need reverse dependency edges from subtask to parent so parents can be unlocked when a subtask is consumed.
- The common mistake is pushing every task into the heap before prerequisites are satisfied. Keep blocked tasks out of the ready heap until their unmet-subtask count reaches zero.
- For
updateDeadline, lazy deletion is usually simpler than removing arbitrary heap entries: update the canonical task map, push the new deadline, and discard stale heap entries during consume. - The interview can become a mini job-scheduler design discussion if there is extra time. Be ready to speak about DAG validation and locking without overbuilding the first implementation.
- The deadline-update third part is a recent addition. The interviewer may advance immediately after each completed part, allow unrestricted run/debug cycles, and not require screen sharing.
- Plan to complete all three parts within the round; passing may depend on clearing the full sequence.
Preparation
- Implement the three parts with a heap,
task_id -> taskmap,remaining_prereq_count, andsubtask_id -> parent_idsreverse adjacency. - Drill cycle detection separately with DFS colors or Kahn's algorithm so the DAG-validation follow-up is immediate.
- Write tests for empty queue, duplicate deadline tie-breaks, parent-before-child blocking, update-before-consume, update-after-consume, and stale heap entries.