荣誉版主
- 积分
- 36628
- 学分
- 个
- 大米
- 颗
- 鳄梨
- 个
- 水井
- 尺
- 蓝莓
- 颗
- 萝卜
- 根
- 小米
- 粒
- UID
- 4280
- 注册时间
- 2010-2-20
- 最后登录
- 1970-1-1
- 在线时间
- 小时
- 好友
- 收听
- 听众
- 日志
- 相册
- 帖子
- 主题
- 分享
- 精华
|
我周末都水掉了,前面也好多Fail,真是惭愧。发最佳还是宁缺毋滥好啊。
本楼: |
👍
0% (0)
|
|
0% (0)
👎
|
全局: |
👍 93% (7812) |
|
6% (538) 👎 |
本帖最后由 一剑终情 于 2012-3-25 21:40 编辑
1 Introduction Table
| Creative | Social | Jobs | Survive | Spring Break | 1.5<x<2.5 | x<4 | x>6.5 | ≈12 |
note:
1 Because I have to take much time to look for apartment, I decided to add some time to Social, which includes family-related activities.
2 To restrict gaming activities that were emerging last week, I decided to cut some time from Creative.
3 The time for looking for job will be in Jobs.
2 Background List
-1 look for job
- 1.1 finish resume
- 1.2 submit resume to engineering career fair
-2 cs480 midterm (on 4/2)
- 2.1 catch up with the progress of lectures 1 - spring break (exp 3/25)
- 2.2 go through slides again to remember important material (exp 3/25)
- 2.3 catch up with the progress of lectures 2 - after qualifier
- 2.4 go through slides again to check and to solve the examples on the slides
-3 cs422 implementation phase (due 4/16)
- 3.1 discuss with teammates to talk about how to do implementation work together
- 3.2 I don't know yet
-4 cs525 paper presentation (due 3/28)
- 4.1 go over the paper to form a basic understanding (exp 3/20)
- 4.2 read it in detail while check lots of references (exp 3/25)
- 4.3 prepare slides and talk
- 4.4 rehearse for several times
-5 construct personal website (postpone due to priority) - 5.1 design - 5.2 change blog template using CSS and PHP - 5.3 write code for front page - 5.4 import contents to sections6 look for apartment
-6 qualifier exam (on 3/30)
- I have no idea about the detail of preparing for the qualifier, but I do know that this event should have the highest priority
3 Proposal Schedule | 3.19 | 3.20 | 3.21 | 3.22 | 3.23 | 3.24 | 3.25 | Total | 1 sleep before 2am | F | F | F
| F | F | F | F | F | 2 2.1 - 2.2 |
| |
|
|
| | |
| 3 3.1 - ? | 3.1 failed |
|
| | | | |
| 4 4.1 - 4.2 |
|
| 4.1 done | | | | |
| 5 Creative | F | S | S | F | S | F | F | F | 6 Social | F | S | S | S | S | S | S | S | 7 Jobs | F | F | F | F | F | F | F | F | 8 1.1 - 1.2 | | |
|
|
|
| |
|
4 Experiment Log
3.19
looked for apartment in the afternoon; played card games with friends at night
4.1 in progress; 3.1 failed | 3.20
slept in the morning; looked over one apartment in the afternoon
4.1 & 4.2 in progress | 3.21
slept in the morning; finished reading the paper and found more relevent paper to read
4.1 accomplished; 4.2 in progress | 3.22
went to OIS in the morning; saw an apartment and talked to Xue Zhang in the afternoon
1 in progress; 4.2 in progress; 6 canceled | 3.23
slept in am; went to see an apartment in pm
4.2 & 4.3 in progress | 3.24
seems that didn't do anything.
4.2 & 4.3 in progress
| 3.25
finished cs525 project 3 proposal today (not in Section 2);
2.1 in progress; | 没图没真相 | 没图没真相 | 没图没真相 | 没图没真相 | 没图没真相 | 没图没真相 | 没图没真相 |
5 Conclusion & Future Work
Conclusion:
Fail:
Everything but Social
Success:
Nothing but Social
Grade:
0
Future Work:
In the middle of this week, I started a physical practice plan, which will be added to my schedule since next week.
Next week still has several dues even though I canceled qualifier exam. Good news is that I have finished one, project 3 proposal, due at Wednesday 9pm. The other one is that I'll give presentation on Thursday. Still got a lot of work to do before totally prepared. This time the slides will be difficult to prepare because it contains a lot of formulas and algorithms. Don't know what to do about it (Maybe this is one of the reason why I procrastinate a lot this week).
Another event coming up is the 2nd midterm of cs480, at April 2nd.
It seems that schedule is not very tight, but it is not true. I was suppose to finish all these business this week so that I'll have enough time to deal with projects that due on April 16th next week.
But I failed.
Because I'll have to deal with these business next week. Projects will not commence until April 2nd, which means I'll only have 2 weeks to finish two integrated, huge, giant, impossible projects. I'll definitely be damned. |
评分
-
查看全部评分
|