Power plant company called “Energy One”, in the process of transitiODE_0 ]- </blockquote></div>a. Power plant can produce 8.8 MM MW/H electricity per year, lease of land cost 5MM/month, Fixed Cost = 25 MM/year, VC = 20 dollars per MW/H; sell produced electricity at 40 dollars per MW/H.
- b. Initial investment by the investors are 400MM and are expecting 10% year return
- c. Question: What is the minimum MW/H electricity the company need to make & sale to hit the 10% per year investment return goal (assume all produced electricity will be sold)
- 4) Follow-up: government restrictions that only let company to produce 5MM MW/H per year from fossil fuels, what are some of the other energy sources that we want to tap into?. 1point 3 acres
- 5) 第二个计算题
- a. Build 2 mini test plant, one is solar, one is ethanol, to produce the additional electricity needed
- b. Solar: initial investment is 12.5MM. In a year, 75% of time is sunny and can produce 150K MW/H per year, 25% is cloudy and can produce 50K MW/H per year, VC = 0 because sunlight is free, still sell electricity at 40 dollars per MW/H. How many years needed to cover initial investment. .и
- .1point3acres
- c. Ethanol: initial investment is 2.5 MM. produce 100K MW/H per year, VC = 30 dollars per MW/H, sell electricity still at 40 dollars per MW/H, same question
- 6) Follow-up: Which test plant do you recommend</div><div><div class="blockcode"><blockquote>[hide=200]l1209881372@gmail.com[/hide]